• Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment
  • Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment
  • Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment
  • Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment
  • Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment
  • Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment

Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment

Type: Pipe Extruder
Plastic Processed: Pert, HDPE,PU,PPR,PVC
Product Type: Extrusion Molding Machine
Feeding Mode: One Feed
Assembly Structure: Integral Type Extruder
Screw: Single-Screw
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2017

Suppliers with verified business licenses

Shandong, China
Importers and Exporters
The supplier has import and export rights
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (13)

Basic Info.

Model NO.
16-180mm
Engagement System
Full Intermeshing
Screw Channel Structure
Deep Screw
Exhaust
Don′t Exhaust
Automation
Automatic
Computerized
Computerized
Pert II Insulation Pipe Structures
Three Layers
Pert II Pipe Diameters
From 30mm to 160mm
Pre-Insulation Pipa Applications
Air-Conditioning Piping System, Hot Spring Pipies
HDPE Jacket
out Layer
HDPE Jacket Pipe Machine
Vacuum Calibration Method Forming, Reliable Qualit
Polyurethane Foaming Machine
High Precision, Self-Cleaning
Payment Terms
30% Prepayment, 70% Balance Before Shipment
Main Elementes
Siemens, ABB, Omron, Shneider, Rkc, Teco
Production Period
40-60 Working Days
Warranty Period
18 Months
Transport Package
Standard Package
Specification
30, 75, 110, 160mm
Trademark
Qingdao Sincere Machinery
Origin
China
HS Code
8477209000
Production Capacity
100 Sets Per Year

Product Description

One-step PERT II insulation pipe production line.
Polyurethane flexible insulation tube extrusion making machine.




PERT II insulation pipes:

The international heating system implements the "plastic replaces steel" plan, and the secondary pipe network reconstructs a new, and the PERT II thermal insulation pipes as a new pipeline, attracting much attention and popularity.

PERT II insulation pipes structures: PERT pipe inner layer + PU foaming layer + HDPE jacket outer layer

 
Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment



PERT II insulation pipes applications:
1. PE-RT II prefabricated direct-buried heat-insulating composite plastic pipe has excellent performance and is widely used in secondary pipe network systems for urban central heating, hot water systems, and HVAC systems.
2.. It occupies less land, is quick to construct and is conducive to environmental protection. Directly buried heat pipes do not need to build huge trenches. They only need to insulate the underground heat insulation pipes, which greatly reduces the project's land occupation, reduces earthwork excavation volume by more than 50%, and reduces civil engineering masonry and concrete volume by 90%. At the same time, the insulation pipe processing and the trenching in situ are carried out in parallel, and only the on-site joints can shorten the construction period by more than 50%.
3. Security.


Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment

Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment

The composition of the PERT II insulation pipe production line:
extruders, extrusion coating head, vacuum calibrating cooling tanks, automatic correcting device, tractor, cutting machine, stacker, polyurethane foaming machine, etc.

Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment
Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment

Plastic Polyurethane Thermal Insulation Tube Manufacturing&Processing Equipment


PERT II insulation pipe Production line features:
The production line realizes one-time molding process of the inner tube, foam insulation, and outer protection layer. The operation is simpler, the stability is better, the production can be continuous, the quality is guaranteed, the reject rate is low, and the cost is low.
The special screw design ensures full melting, constant pressure, good plasticizing effect, stable raw material extrusion stability and continuity.

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now